Heavily corroded structural steel I-beam with rust bleeding down concrete, flaking paint and deep pitting visible
Before
Same structural steel I-beam fully restored to mill-finish, blasted clean, zinc-gray primer applied, every edge sharp
After — 72 hrs

Same beam. Same building.
72 hours apart.

We strip decades of rust and corrosion from structural steel — bridges, warehouse frames, fire escapes, water towers — and restore them to mill-finish strength.

840+
Structures Restored
0
Warranty Claims Filed
72 hrs
Avg. Turnaround
Schedule a Site Assessment
SSPC-SP6 Commercial BlastSSPC-SP10 Near-White BlastInorganic Zinc-Rich PrimerNSF 61 Potable Water SystemsEpoxy Mastic IntermediatePolyurethane Topcoat5-Year Written WarrantyDFT Documentation IncludedHoliday Testing on Immersion ZonesSSPC-SP6 Commercial BlastSSPC-SP10 Near-White BlastInorganic Zinc-Rich PrimerNSF 61 Potable Water SystemsEpoxy Mastic IntermediatePolyurethane Topcoat5-Year Written WarrantyDFT Documentation IncludedHoliday Testing on Immersion Zones

If the coating fails, we come back.

Five years. Written. No asterisks. Every job we touch carries a warranty that means something — because our process makes it safe to offer.

5-Year Coating Warranty

Written warranty on every zinc-prime and topcoat application

Inspection Documentation

Full photographic record and coating thickness reports on delivery

72-Hour Turnaround Guarantee

Most structural steel jobs completed within three working days

SSPC-SP6 or Better

Every surface prepared to Commercial Blast minimum — no exceptions

Three stages. Zero shortcuts.

The warranty is only as strong as the process behind it. Here's exactly how we work — and why the sequence matters.

01 / Strip

02 / Treat

03 / Coat

Industrial abrasive blasting equipment stripping rust from structural steel beam, sparks and grit visible
Surface Prep
Technician applying zinc-rich primer to freshly blasted steel surface with spray equipment
Corrosion Protection
Industrial coating inspection showing DFT thickness gauge measurement on freshly coated steel structure
Final Coat + Documentation
Industrial abrasive blasting equipment stripping rust from structural steel beam, sparks and grit visible
01

Strip — Down to Bare Metal

We begin with abrasive blasting — angular steel grit at 90–100 psi — removing all mill scale, rust, old coatings, and surface contamination to SSPC-SP6 Commercial Blast minimum. On tight sites we use vacuum-blast containment; open sites run open-blast with full sheeting. No grinder shortcuts. No wire-brush finishes. The surface profile is measured and documented before anyone opens a primer can.

SSPC-SP6 minimum. SP10 Near-White on high-exposure steel.
Technician applying zinc-rich primer to freshly blasted steel surface with spray equipment
02

Treat — Zinc-Rich Primer Within the Hour

Bare steel oxidizes within minutes of blasting. Our crews prime within 30–60 minutes of blast completion — no exceptions. We apply inorganic zinc-rich primer (85%+ zinc by weight in dry film) directly to the bare profile. This galvanic protection layer is the reason our coating systems outlast paint-over-rust patches by a decade. DFT is measured at every panel before the crew moves on.

30–60 min blast-to-prime window. 3–4 mil DFT zinc-rich.
Industrial coating inspection showing DFT thickness gauge measurement on freshly coated steel structure
03

Coat — Inspection-Ready, Every Time

Intermediate and topcoat are applied per the project spec — epoxy mastic intermediate for build, polyurethane or alkyd topcoat for UV and chemical resistance depending on environment. Every coat is DFT-checked, holiday-tested on immersion zones, and photographed. You receive a full coating report: surface profile, DFT readings by panel, product data sheets, and batch numbers. That documentation is what backs the five-year warranty.

Full DFT report + photographic record delivered at project close.

Residential railings to municipal bridges.

Every job backed by the same process. Every coating system documented and warranted.

Municipal bridge steel girders being restored, scaffolding in place over river, industrial setting
Municipal Bridge

Rte. 9 Overpass Girders

Springfield, IL

Section loss >15% on lower flanges, DOT compliance deadline 90 days out.

+210% service life extension
Passed DOT inspection first attempt
SSPC-SP10 / Inorganic Zinc / Epoxy Mastic / Polyurethane
Industrial warehouse interior showing steel mezzanine structure with corroded columns being restored
Warehouse Mezzanine

Midland Distribution Center

Gary, IN

Insurance adjuster flagged corroded W8 columns. 30-day cure-or-vacate notice.

6 weeks, facility never shut down
Zero production interruption
SSPC-SP6 / Zinc-Rich Epoxy / Alkyd Topcoat
Urban fire escape on tall residential building, corroded metal stairs on brick facade
Fire Escape

14-Story Residential Tower

Chicago, IL

City citation. Pitting corrosion on all 28 landings, through-rust on 3 stringers.

Citation cleared in 8 days
28 landings, 8 days total
SSPC-SP6 / Zinc Primer / Alkyd Enamel
Large municipal water tower structure showing steel surface preparation work in progress
Water Tower

Harwick Municipal Tank

Harwick, PA

Interior coating failure. Rust bloom on 40% of shell. EPA potable water recoat standard.

NSF 61 compliant recoat
EPA & NSF 61 compliant
SSPC-SP10 / NSF-61 Epoxy Interior System

The guarantee held. Every time.

"

We had a 30-day cure-or-vacate notice from our insurance carrier. Forge showed up on day two, blasted and primed by day four, topcoat done by day six. The adjuster cleared us with zero punch list. I've never seen a contractor move that fast without cutting corners — and I've seen the documentation to prove they didn't.

Dennis Okafor, facility manager at Midland Distribution, middle-aged Black man in hard hat
Dennis Okafor
Facility Manager, Midland Distribution LLC
Warehouse Mezzanine
"

The DOT gave us 90 days to bring the overpass girders into compliance or face closure. We'd already had two other contractors walk after seeing the section loss. Forge assessed on Monday, mobilized Thursday, and handed us a full coating report with DFT readings by panel. First-attempt pass. I keep that report in my desk drawer.

Carol Szynski, bridge program manager, professional woman with short dark hair in office setting
Carol Szynski
Bridge Program Manager, Springfield City Engineering
Municipal Bridge
"

I've been running GC work for 18 years. Steel prep is always the thing that delays the next trade. Forge gave me a firm three-day window, hit it, and handed off a surface that our coating sub called the cleanest profile he'd seen in a decade. That's the kind of sub you put on every bid.

Marcus Webb, senior project manager at construction company, white man in his 40s with safety vest
Marcus Webb
Senior Project Manager, Webb & Kowalczyk Construction
General Contractor
Quick Estimate Path

Not ready to book a crew?

Send us photos of your steel and a brief description. We'll tell you within one business day whether it's salvageable, what spec we'd recommend, and a rough cost range. No commitment required.

Send Photos →

Let's see what's
under the rust.

We do site assessments at no charge within 50 miles. You'll leave knowing exactly what the steel needs, what spec we'd apply, and what it'll cost — before you commit to anything.

Free site assessment within 50 miles
Written scope and cost before any work begins
Response within 4 business hours

Free within 50 miles · Written scope provided before any work begins

Schedule Site Assessment→